Turnkey project
The project involved the installation of a rail gate with full automation, a pedestrian gate with stainless steel hardware and an LED keypad. It also included fencing for the front part of the property, spanning over 9 meters. The gate and fencing were made in a slatted design in RAL 7016. This project was carried out in the locality of Svinica.
Client: Róber H.
Location: Svinica
Date: 06/12/2023
Order from the customer
The client contacted us through our free price quote form on the website, where they provided project parameters, including dimensions, gate type, and accessory requirements. The inquiry also included the installation location and specific requests regarding gate automation and integrating an LED keypad with a code-based opening system. Based on this information, we prepared a tailored price quote within 48 hours, which we then explained to the client over the phone. After mutual agreement, we scheduled an in-person meeting at the site.
Project realisation
After the in-person meeting, we carefully listened to the client’s requirements. The client wanted to close off the front part of the property with a rail gate, for which the necessary infrastructure was already in place. The client requested a specific solution for opening the gate in case of forgotten keys. The solution was the installation of an LED keypad that allows code-based opening of the gate and pedestrian gate. After agreeing on all the details, we began the implementation process. The implementation time was set to a maximum of 14 weeks from the measurement.
General view
General view
Rail gate
Inside view
Entrance part
Fence parts
Fence parts
Fence parts
Pedestrian gate
Inside view