Double-leaf gate, pedestrian gate and fence parts

A double-leaf gate with an electric drive, an entrance barrier with stainless steel handles and 5 fence parts, which we anchored to the existing masonry columns. We also implemented openings for distribution boxes for 2 fence parts. The complete order could not lack our cover strips. As a model, our client chose one of the popular brown blind designs with a fine structure.

Client: Miroslav R.

Place: Košice – Krásna

Date: 12/05/2020

REFERENCE

Real references are what we rely on. Real people and real satisfaction.

Order from the customer

The first contact from the client came to our e-mail box, where the client sent us all the information necessary to calculate the price offer. On the basis of this data, data on the dimensions of the openings, appearance, and other accessories, we calculated a tailor-made price offer for the client. After drawing up and approving the price offer, we agreed on a personal meeting right on the spot, where we focused on the exact dimensions of the openings and agreed on all the details regarding accessories. The focus itself and the start of production were even before the adjustments were made to the brick part of the fence, where we had to agree on the observance of the predetermined dimensions from the client. It was a double-wing entrance gate with an electric drive, an entrance barrier for pedestrians and 5 fence parts. In the case of two fence parts, it was also necessary to focus on the exact dimensions for the openings that were to serve as openings for distribution boxes. As a model, the customer chose a frequently used modern blind slat. The whole project was realized in brown color with a fine structure.

01.

Dimension of holes

Double-leaf gate– 3200mm x 1600mm

Pedestrian gate – 900mm x 1600mm

Fence parts– 1800mm x 900mm

02.

Pattern

03.

Color

Brown RAL8025 – fine structure

04.

Accessories

– KEY RAY electric drive

– 2x remote control

– KUBE for phone opening

– side cover bars

– stainless steel handles

 

Project realisation

The time from focus to turnkey assembly lasted 7 weeks, where, in addition to our work, the process of hot-dip galvanizing and then powder coating took place. When the products were ready, we agreed with the client on the assembly date. The overall assembly turned out to be excellent, even if there were minor complications. During the installation of the gate drive, there was a problem connecting to the cables because their length was insufficient, but the skilled hands and wise heads of our technicians dealt with this complication on the spot. One of the problems that arose was also related to the fact that the caps on the wall were a little lower than we originally calculated, and we could not go lower with the fence parts, as we had precisely made holes for the distribution boxes. As a result, we simply agreed with the client on the lower cover bar in order to optically reduce the gap. The installation went well, the client was satisfied with our work, and his review is proof of that.

Dvojkrídlová brána, bránička a plotové dielce

General view

Dvojkrídlová brána, bránička a plotové dielce
General view from the other side
Dvojkrídlová brána, bránička a plotové dielce
Double-leaf gate with pedestrian gate
Dvojkrídlová brána, bránička a plotové dielce
Double-leaf gate
Dvojkrídlová brána, bránička a plotové dielce
Pedestrian gate
Dvojkrídlová brána, bránička a plotové dielce
Fence panel
Dvojkrídlová brána, bránička a plotové dielce
View from the inside of the gate and the pedestrian gate
Dvojkrídlová brána, bránička a plotové dielce
View from the inside of the fence parts
Dvojkrídlová brána, bránička a plotové dielce
KEY RAY drive
Dvojkrídlová brána, bránička a plotové dielce
Color detail
Dvojkrídlová brána, bránička a plotové dielce
Detail of photocells
Dvojkrídlová brána, bránička a plotové dielce
Lighthouse