Double-leaf gate with pedestrian gate

In the village of Jablonové, we prepared a custom-made project upon request. Its contents consisted of a double-leaf gate with full automation of the KEY brand and a barrier with stainless steel fittings. A big advantage is the possibility of opening the gate not only with controllers, but also with a mobile device. We anchored the entire project to our 100x100mm anchoring posts. On request, we received a 4mm square wire as a sample. The condition was compliance with the gabion fencing pattern. Along with the pattern, we also caused the color of the project.

Client: Ľubomír Ž.

Location: Jablonové

Date: 15/02/2023

Order from the customer

We really cover the whole of Slovakia. The proof is also this project in Záhorí. The client looked for us on the basis of internet presentations. After the presentation of our products, he contacted us with a request for a price offer. Based on the supplied dimensions and accessories, we created an offer for the client within 48 hours. Subsequently, after the mutual meeting, we met the client personally on the spot. The client explained the details of the pattern and color to us. We have completed all the details. Since there were no significant changes since the initial entry, the price remained unchanged. After the client’s approval, we sent the project to production.

01.

Dimension of holes

Double-leaf gate – 3800mm x 1750mm

Pedestrian gate – 900mm x 1750mm

Pillars – 100mm x 100mm

02.

Pattern

4mm wire – keeping the square pattern on the gabion wall

03.

Color

RAL 9007

04.

Accessories

KEY drive (LED beacon, photocells, controllers)

KUBE – phone control

Stainless steel fittings

Cover system

Project realisation

The implementation of the project proceeded according to plan. The fact that the model chosen by the client is not in our portfolio has not changed anything in the process that our products go through. As the project progressed through the production process, the client was automatically informed via email about its status. At the moment when the project was ready for assembly, we contacted the client with the assembly date. Installation took place within 1 working day. At the end of the installation, we handed over the project to the client, which met the conditions set at the beginning.

General view

 

Double-leaf gate with pedestrian gate

Double-leaf gate with pedestrian gate

Inside view

Inside view